Force Release Mold
Product size: Ø104.8x19.5
Product material: PP/TPE/TPA
Mould cavity: 1x4 cav
Cycle time: 33s/21s/20s
Design cycle: 7 working days
Manufacturing cycle: 40working days
Manufacturing date: 2015.01
Core insert structure
Moldflow analysis - Verification of pressure loss
The pressure at V/P switchover
around 32.53 MPa, the value is acceptable.
Water flow optimization - simulation and verification
The cooling analysis screen output contains the change in coolant temperature from coolant-into coolant-out If the increase is unacceptable (greater than2~3deg.c)
Air trap as the spot shows, these
areas must be well vented on the mold to prevent air trapping at the end of
filling.